Project Summary

A high-rise building required the insulation of various HVAC systems and fire-stop penetrations. This included the insulation of indoor and outdoor plumbing and the insulation of interior HVAC ducting and equipment, and the installation of fire-stopping and acoustical caulking at penetrations through fire-rated walls and acoustical walls. The schedule required working around multiple trades in the completion of our scope of work in addition to meeting local hiring requirements.