Project Summary

Asbestos-related work included removal and disposal of flooring, mastics, fireproofing, TSI, drywall with joint compound, texture on concrete, roofing, penetration mastics, and transite panels. Lead-related work included removal and disposal of lead-lined drywall, loose and flaking paint, ceramic wall/floor tile, and terrazzo shower pans. PCB-related work included removal and disposal of roofing materials, penetration/pipe support mastics, aluminum windows and panel assemblies, stucco wall assemblies, perimeter metal roof flashings, air vents, window and door assemblies, and selective concrete.

Similar Projects
Employee Portal
Skip to toolbar